{"id":3104,"date":"2021-09-13T15:09:19","date_gmt":"2021-09-13T07:09:19","guid":{"rendered":"https:\/\/edu.pioneer4ss.com\/?p=3104"},"modified":"2025-03-27T21:31:55","modified_gmt":"2025-03-27T21:31:55","slug":"master-of-science-in-construction-management-building-information-modelling","status":"publish","type":"post","link":"https:\/\/pioneer4ss.com\/en\/blog\/master-of-science-in-construction-management-building-information-modelling\/","title":{"rendered":"Master of Science in Construction Management (Building Information Modelling)"},"content":{"rendered":"<h2>Master of Science in Construction Management (Building Information Modelling) \u2013 INTI<\/h2>\n<p>As new technologies become available, so do new opportunities for the next generation of leaders to capitalise on the growing importance of a variety of innovative solutions to broaden the scope of the construction industry and gain a competitive edge in our increasingly interconnected global construction economy.<\/p>\n<p><strong>Entry Requirements<\/strong><\/p>\n<ul>\n<li>Bachelor\u2019s Degree (Level 6 Malaysian Qualification Framework, MQF) in Engineering \/ Engineering Technology \/ Construction Management \/ Architecture \/ Architectural Technology or its equivalent with a minimum CGPA of 2.5; AND<\/li>\n<li>Bachelor\u2019s Degree (Level 6 MQF) in Engineering \/ Engineering Technology \/ Construction Management \/ Architecture \/ Architectural Technology or its equivalent with CGPA above 2.0 but less than 2.5 may be admitted subject to a minimum of 5 years working experience in relevant field.<\/li>\n<li>Candidates with Bachelor\u2019s Degree of Science or Technology degrees or their equivalents (non-Engineering \/ Engineering Technology \/ Construction Management \/ Architecture \/ Architectural Technology) are required to take 2 bridging courses before commencing the programme.<\/li>\n<\/ul>\n<p><strong>English Requirements<\/strong><\/p>\n<p>TOEFL 500 OR IELTS 5.0<\/p>\n<p><strong>Programme Structure<\/strong><\/p>\n<p>Programme can be completed in Full time: 1 year | Part time: 2 years.<\/p>\n<ul>\n<li>BIM Applications<\/li>\n<li>BIM based E Procurement<\/li>\n<li>BIM Management<\/li>\n<li>BIM Theory and Practice<\/li>\n<li>\u00a0Occupational Safety and Health<\/li>\n<li>Advanced Construction Project Management<\/li>\n<li>Research Methodology<\/li>\n<li>Strategic Management<\/li>\n<li>Managing Organisations<\/li>\n<li>Innovation and Knowledge Management<\/li>\n<li>Project<\/li>\n<\/ul>\n<p><strong>Full time<\/strong>: 1 year | <strong>Part time<\/strong>: 2 years<\/p>\n<p>Campus Intakes<\/p>\n<p>Offered at INTI International University.<\/p>\n<p><strong>INTI International University<\/strong><\/p>\n<ul>\n<li>January<\/li>\n<li>May<\/li>\n<li>September<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Master of Science in Construction Management (Building Information Modelling) \u2013 INTI As new technologies become available, so do new opportunities for the next generation of leaders to capitalise on the growing importance of a variety of innovative solutions to broaden the scope of the construction industry and gain a competitive edge in our increasingly interconnected [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":3102,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[80],"tags":[],"class_list":["post-3104","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-80"],"_links":{"self":[{"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/posts\/3104","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/comments?post=3104"}],"version-history":[{"count":2,"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/posts\/3104\/revisions"}],"predecessor-version":[{"id":23261,"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/posts\/3104\/revisions\/23261"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/media\/3102"}],"wp:attachment":[{"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/media?parent=3104"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/categories?post=3104"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/tags?post=3104"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}