{"id":16925,"date":"2021-09-08T14:37:43","date_gmt":"2021-09-08T06:37:43","guid":{"rendered":"https:\/\/edu.pioneer4ss.com\/?p=3098"},"modified":"2025-03-27T21:32:01","modified_gmt":"2025-03-27T21:32:01","slug":"master-of-science-in-construction-management-contract-administration","status":"publish","type":"post","link":"https:\/\/pioneer4ss.com\/en\/blog\/master-of-science-in-construction-management-contract-administration\/","title":{"rendered":"Master of Science in Construction Management (Contract Administration)"},"content":{"rendered":"<h2><strong>Master of Science in Construction Management (Contract Administration)<\/strong><\/h2>\n<p>A project manager or contract manager will be involved in evaluating and selecting a procurement system that is most appropriate to the work requirements and compliance with economic, legal, cost, time, and quality requirements, as well as managing it efficiently and effectively, in every construction project. As a result, they must be well-versed in the fundamentals and philosophy of construction legislation, as well as the operational features of the various project procurement and contracting procedures.<\/p>\n<p><strong>Entry Requirements<\/strong><\/p>\n<ul>\n<li>Bachelor\u2019s Degree (Level 6 Malaysian Qualification Framework, MQF) in Engineering \/ Engineering Technology \/ Construction Management \/ Architecture \/ Architectural Technology or its equivalent with a minimum CGPA of 2.5; AND<\/li>\n<li>Bachelor\u2019s Degree (Level 6 MQF) in Engineering \/ Engineering Technology \/ Construction Management \/ Architecture \/ Architectural Technology or its equivalent with CGPA above 2.0 but less than 2.5 may be admitted subject to a minimum of 5 years working experience in relevant field.<\/li>\n<li>Candidates with Bachelor\u2019s Degree of Science or Technology degrees or their equivalents (non-Engineering \/ Engineering Technology \/ Construction Management \/ Architecture \/ Architectural Technology) are required to take 2 bridging courses before commencing the programme<\/li>\n<\/ul>\n<p><strong>English Requirements<\/strong><\/p>\n<p>TOEFL 500 OR IELTS 5.0<\/p>\n<p><strong>Programme Structure<\/strong><\/p>\n<p>Programme can be completed in Full time: 1 year | Part time: 2 years.<\/p>\n<ul>\n<li>Construction Law, Contract and Dispute Resolution<\/li>\n<li>Contract and Procurement<\/li>\n<li>Pre Contract and Post Contract Practice<\/li>\n<li>BIM Theory and Practice<\/li>\n<li>Occupational Safety and Health<\/li>\n<li>Advanced Construction Project Management<\/li>\n<li>Research Methodology<\/li>\n<li>Strategic Management<\/li>\n<li>\u00a0Managing Organizations<\/li>\n<li>Innovation and Knowledge Management<\/li>\n<li>\u00a0Project<\/li>\n<\/ul>\n<p><strong>Full time<\/strong>: 1 year | <strong>Part time<\/strong>: 2 years<\/p>\n<p>Campus Intakes<\/p>\n<p>Offered at INTI International University.<\/p>\n<p><strong>INTI International University<\/strong><\/p>\n<ul>\n<li>January<\/li>\n<li>May<\/li>\n<li>September<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Master of Science in Construction Management (Contract Administration) A project manager or contract manager will be involved in evaluating and selecting a procurement system that is most appropriate to the work requirements and compliance with economic, legal, cost, time, and quality requirements, as well as managing it efficiently and effectively, in every construction project. As [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":3096,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[80],"tags":[],"class_list":["post-16925","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-80"],"_links":{"self":[{"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/posts\/16925","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/comments?post=16925"}],"version-history":[{"count":2,"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/posts\/16925\/revisions"}],"predecessor-version":[{"id":23263,"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/posts\/16925\/revisions\/23263"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/media\/3096"}],"wp:attachment":[{"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/media?parent=16925"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/categories?post=16925"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pioneer4ss.com\/en\/wp-json\/wp\/v2\/tags?post=16925"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}